Woolsey, Robert E. D., 1936-Goldman, Wayne A.2021-02-232022-02-032021-02-232022-02-031980https://hdl.handle.net/11124/176028Includes bibliographical references.masters thesesengCopyright of the original work is retained by the author.Production schedulingManufacturing processesNetwork analysis (Planning)Shortest path approach to an extended basic period procedure for solving the economic lot scheduling problem, TheText