• Login
    View Item 
    •   Home
    • Library Collections
    • Tell Ertl Oil Shale Repository
    • Publications - Tell Ertl Oil Shale Repository
    • View Item
    •   Home
    • Library Collections
    • Tell Ertl Oil Shale Repository
    • Publications - Tell Ertl Oil Shale Repository
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Mines RepositoryCommunitiesPublication DateAuthorsTitlesSubjectsThis CollectionPublication DateAuthorsTitlesSubjects

    My Account

    Login

    Mines Links

    Arthur Lakes LibraryColorado School of Mines

    Statistics

    Display Statistics

    Monthly progress memorandum (covering May 16 to June 15, 1965)

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    SoMo0256.pdf
    Size:
    2.842Mb
    Format:
    PDF
    Description:
    Monthly progress memorandum ...
    Download
    Author
    Mobil Oil Corporation
    Date
    1965-06-21
    Keywords
    technical and run reports
    gas combustion retort
    Anvil Points
    Combustion
    Oil-shales
    
    Metadata
    Show full item record
    URI
    https://hdl.handle.net/11124/258
    Abstract
    The United States Bureau of Mines facility at Anvil Points, near Rifle, Colorado, was reactivated starting in May 1964 and was operated during 1965, 1966, and 1967. A research and development program was conducted to investigate the technical feasibility of room-and-pillar mining with explosives, crushing and Gas-Combustion Retorting techniques for oil shale. Mobil Oil Corporation acted as Project Manager for the cooperative industry group at Rifle which included Continental Oil Company, Humble Oil and Refining Company, Pan American Petroleum Corporation, Phillips Petroleum Company, and Sinclair Research, Inc. as Participating Parties. The primary objective of the Anvil Points Oil Shale Research Center Monthly Progress Memorandum is to advise authorized personnel employed by the Participating Parties that various activities are in progress or that certain significant data have been obtained within the Research Center. These Monthly Progress Memoranda have been prepared to provide rapid, on-the-spot reporting of research currently in progress at Anvil Points. The conclusions drawn by project personnel are tentative and may be subject to change as work progresses. The Progress Memoranda have not been edited in detail.
    Rights
    In Copyright (http://rightsstatements.org/vocab/InC/1.0/).
    Collections
    Publications - Tell Ertl Oil Shale Repository

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.