Show simple item record

dc.contributor.advisorMustoe, G. G. W. (Graham G. W.)
dc.contributor.authorFrank, Glen
dc.date.accessioned2023-05-16T22:27:08Z
dc.date.available2023-05-16T22:27:08Z
dc.date.issued1998
dc.identifierT 5101
dc.identifier.urihttp://hdl.handle.net/11124/176950
dc.descriptionIncludes bibliographical references (pages 144-146).
dc.format.mediummasters theses
dc.languageEnglish
dc.language.isoeng
dc.publisherColorado School of Mines. Arthur Lakes Library
dc.relation.ispartof1990-1999 - Mines Theses & Dissertations
dc.rightsCopyright of the original work is retained by the author.
dc.subject.lcshTunneling -- Equipment and supplies
dc.subject.lcshRock mechanics
dc.subject.lcshRock mechanics -- Mathematical models
dc.titleDevelopment of a pre-bid performance prediction method for hardrock microtunnel boring machines
dc.typeText
thesis.degree.nameMaster of Engineering (M.Eng.)
thesis.degree.levelMasters
thesis.degree.disciplineEngineering
thesis.degree.grantorColorado School of Mines


Files in this item

Thumbnail
Name:
Frank_10781251.pdf
Size:
6.031Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record