Show simple item record

dc.contributor.advisorWoolsey, Robert E. D., 1936-
dc.contributor.authorPence, Norman Eugene
dc.date.accessioned2023-05-08T19:23:15Z
dc.date.available2023-05-08T19:23:15Z
dc.date.issued1986
dc.identifierT 2419
dc.identifier.urihttp://hdl.handle.net/11124/176755
dc.descriptionIncludes bibliographical references (pages 93-96).
dc.format.mediumdoctoral dissertations
dc.languageEnglish
dc.language.isoeng
dc.publisherColorado School of Mines. Arthur Lakes Library
dc.relation.ispartof1980-1989 - Mines Theses & Dissertations
dc.rightsCopyright of the original work is retained by the author.
dc.subject.lcshEconomic lot size -- Mathematical models
dc.subject.lcshCeramic materials
dc.subject.lcshProduction scheduling
dc.titleEconomic model of the multiproduct lot scheduling problem applied to refined ceramic mineral products, An
dc.typeText
thesis.degree.nameDoctor of Philosophy (Ph.D.)
thesis.degree.levelDoctoral
thesis.degree.disciplineMineral Economics
thesis.degree.grantorColorado School of Mines


Files in this item

Thumbnail
Name:
Pence_10796166.pdf
Size:
3.730Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record