Show simple item record

dc.contributor.advisorDavis, Donald G.
dc.contributor.authorRamirez, Ivan G.
dc.date.accessioned2020-12-15T21:06:00Z
dc.date.accessioned2022-02-03T10:52:18Z
dc.date.available2020-12-15T21:06:00Z
dc.date.available2022-02-03T10:52:18Z
dc.date.issued1991
dc.identifierT 4157 ER
dc.identifier.urihttps://hdl.handle.net/11124/175466
dc.descriptionIncludes bibliographical references.
dc.format.mediummasters theses
dc.languageEnglish
dc.language.isoeng
dc.publisherColorado School of Mines. Arthur Lakes Library
dc.relation.ispartof1990-1999 - Mines Theses & Dissertations
dc.rightsCopyright of the original work is retained by the author.
dc.subject.lcshPetroleum engineering
dc.subject.lcshBoring
dc.titleOptimum completion design using underbalance perforation Ceuta field-bloque VII-area 8-Lake Maracaibo Venezuela
dc.typeText
thesis.degree.nameMaster of Engineering (M.Eng.)
thesis.degree.levelMasters
thesis.degree.disciplinePetroleum Engineering
thesis.degree.grantorColorado School of Mines


Files in this item

Thumbnail
Name:
Ramirez_10781207.pdf
Size:
2.837Mb
Format:
PDF

This item appears in the following Collection(s)

Show simple item record