• Login
    View Item 
    •   Home
    • Theses & Dissertations
    • 2019 - Mines Theses & Dissertations
    • View Item
    •   Home
    • Theses & Dissertations
    • 2019 - Mines Theses & Dissertations
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Mines RepositoryCommunitiesPublication DateAuthorsTitlesSubjectsThis CollectionPublication DateAuthorsTitlesSubjects

    My Account

    Login

    Mines Links

    Arthur Lakes LibraryColorado School of Mines

    Statistics

    Display Statistics

    Imaging ahead of a tunnel boring machine with DC resistivity: a laboratory and numerical study

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    Mifkovic_mines_0052N_11744.pdf
    Size:
    30.41Mb
    Format:
    PDF
    Download
    Author
    Mifkovic, Max
    Advisor
    Swidinsky, Andrei
    Date issued
    2019
    Keywords
    forward modeling
    laboratory experiment
    tunneling
    inversion
    DC resistivity
    near surface
    
    Metadata
    Show full item record
    URI
    https://hdl.handle.net/11124/173077
    Abstract
    Tunnel Boring Machines (TBMs) are powerful tools for tunneling and underground construction, which excavate material and install a segmental concrete tunnel liner for support. However, unknown ground conditions pose a significant risk to tunneling operations and any damage to the machine can be disastrous to a project. As such, there is a need for tools which look ahead of the TBM for potential hazards during tunneling, including water saturated zones, faults, boulders and metal pipes. Geophysical methods offer the capability to image ahead of tunneling in order to prevent damage to the machine or nearby infrastructure, thus improving tunneling operations. In particular, the DC resistivity method is useful because it is sensitive to a large range of conductivity variations in geological and man made materials. The research presented in my thesis consists of three parts: (1) a laboratory study of a scale model TBM and tunneling environment, (2) a series of forward models studying different survey designs, and (3) the inversion and imaging of synthetic data under different assumptions. I introduce several new survey designs that attach DC resistivity electrodes on a probe or probes, which are then pushed into the earth in front of the machine each time excavation stops. My laboratory data and forward modeling results show that this method reduces interference caused by the metallic TBM body, and increases the distance ahead of the machine at which a target may be detected: depending on the specific survey design, the TBM influence is minimal once the probe is pushed 20% to 55% of the TBM diameter ahead of the machine and targets can be detected up to 60% TBM diameter away. Finally, I invert synthetic data to produce ahead-of-tunneling images using different amounts of prior information (e.g. TBM and host rock resistivity) and perform a time-lapse inversion, which has not been done for DC resistivity on a TBM before. I conclude the inversions with two types of comparisons to the true model and show that including more prior information decreases model error, but does not necessarily improve how well a target can be imaged.
    Rights
    Copyright of the original work is retained by the author.
    Collections
    2019 - Mines Theses & Dissertations

    entitlement

     
    DSpace software (copyright © 2002 - 2023)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.