• Login
    View Item 
    •   Home
    • Theses & Dissertations
    • 2018 - Mines Theses & Dissertations
    • View Item
    •   Home
    • Theses & Dissertations
    • 2018 - Mines Theses & Dissertations
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of Mines RepositoryCommunitiesPublication DateAuthorsTitlesSubjectsThis CollectionPublication DateAuthorsTitlesSubjects

    My Account

    Login

    Mines Links

    Arthur Lakes LibraryColorado School of Mines

    Statistics

    Display Statistics

    Reliability based models to evaluate the financial consequences of mining equipment component selection and purchasing decisions

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    Pereira_mines_0052E_11566.pdf
    Size:
    2.488Mb
    Format:
    PDF
    Download
    Author
    Pereira, Paulo R.
    Advisor
    Miller, Hugh B.
    Date issued
    2018
    Keywords
    model
    mining management
    purchasing management
    equipment
    Monte Carlo simulation
    financial
    reliability
    
    Metadata
    Show full item record
    URI
    https://hdl.handle.net/11124/172535
    Abstract
    The main deciding factor on the purchase of a component brand for mining equipment is usually the retail price or acquisition cost differential of that component between different manufacturers. The components from different manufacturers will have different contributions to equipment downtime depending on their individual reliabilities, and therefore will directly influence revenue generation. The value of this downtime is often significantly higher than the differences in retail price or acquisition cost between the components. Compounding the situation is that mining companies do not have the models, tools and/or protocols to evaluate different component reliabilities and their immediate impact on the company’s cash flow. A comprehensive assessment of mining operations shows that there are no tools readily available to quantify that impact. As a result, this dissertation focuses on developing a methodology to establish these different reliabilities, how they affect equipment availability, and the immediate impact on a mining company’s cash flow. The methodology developed in this dissertation is evaluated by two approaches or (1) deterministic and (2) stochastic, based on Monte Carlo Simulation. To test the methodology, it is applied to two case studies involving hydraulic hoses from two different surface mines to quantify the relationship between component reliability, mining equipment availability and impact on the mining operation’s cash flow. The results from the models indicate that the lower reliability data set caused lower equipment availability and generated a larger net present value of the cash flows of the revenue loss than the data set with higher reliability. The results also indicate that the methodology can be successfully applied to any equipment component at any mine that uses a component reliability centered management program. The greatest contribution of this research is the methodology produced, which is a more viable alternative than conventional techniques to support operationally and financially effective equipment component purchasing decisions.
    Rights
    Copyright of the original work is retained by the author.
    Collections
    2018 - Mines Theses & Dissertations

    entitlement

     
    DSpace software (copyright © 2002 - 2022)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.